12
Oct
2020
With the Coronavirus pandemic causing some delays, contractors – Bell Electrical Group, are now ready and raring to start on site for Dryfe Vets in Lockerbie.
The vets will be moving down the road to a new and improved clinic converted from what used to be the local Coop!
Although works have been slowly carried out during this time, we are now in a position to start full speed with an aim to complete by the end of February.
See below for some of the ‘before’ pics!